Serving as the cost consultant on SmithGroup’s IDIQ contract for the A-E Design and Related Services, APR has been retained to provide independent cost estimates to support teams with Planning, FCA’s, Feasibility Studies, and Renovation Projects for the modernization of SSA’s nationwide facilities. To date, APR has been issued task orders at 24 SSA renovation/upgrade and construction projects, including:
Annex Building Optimization Study, 2019 – 267,896 GSF, $51M.
Annex Fitness Center Hot Water Infrastructure Replacement, 2020-21 – 356 GSF, $591,821
Boiler Room Column Repair, 2018 – $29,197
Child Care Center Walk-in Cooler, 2019-2020 – $188,600
Child Care Center Partition Wall Order-of-Magnitude estimate, 2018 – $12,669
Child Care Center Sidewalk Replacement, 2018 – $157,000
Chicago Remote Operations Computing Center, 2019 – 1650 GSF, $985,000
Distributed Antenna System:
Arthur J. Altmeyer Building Modernization, 2020 – $1.03M
Durham, NC Campus DAS, 2020 – $205,000
Fredrick, MD NSC Building, 2020 – $293,000
Woodlawn, MD Campus, 2020 – $6.76M
National Computer Center 3rd Floor Distributed Software Engineering Lab and N.W. Quad Draft POR, 2018 – 558,596 GSF, $4.67M
East High/Low Rise Buildings Optimization Study, 2019 – 178,814 GSF, $35.4M
EB Antenna, Order of Magnitude, 2018 – $41,471
Fire Alarm Amplifier Overheating Study Phase 1, 2019 – $534,000
Fire Alarm Amplifier Overheating Study Phase 2, 2020 – $530,000
Guard Booth Installation, 2018 – $709,992
HQ Area of Refuge Communications, 2020 – $471,000
National Computer Center Occupant/Load Feasibility Study, 2018 – $18.4M
National Support Center Power Usage Effectiveness Study, 2020 – various recommendations, up to $4.23M
OSEP Intelligence Community Directive 705 Compliance Study – Headquarters Control Space, 2020 – 1320 GSF, $412,000
Perimeter East Building Interior Fit-Out
2nd Floor Optimized Swing Space, 2019-20 – 30,362 GSF, $1.45M
3rd Floor SIC/SOC Rooms Optimization, 2019-20 – 8323 GSF, $1.3M
Stairwell Door Widening, 2019 – $679,000
Penetration Fire Stopping Study, 2019 – 3971 GSF, $645,670
Robert M. Ball Building Optimization Study, 2019 – 618,278 GSF + 2 stair towers, $195M
Second Support Center Data Center Computational Dynamic Analysis, 2020 – $278,925
Second Support Center Uptime Gap Analysis ROM Estimate Report, 2020 – $576,517
Tenant Improvement Pricing Proposal, 2020 – 8014 GSF, $436,667
Services Provided: Estimating
Sectors: Federal
$200M – $500M
1M SF – 2M SF

“Aguirre Project Resources has continually delivered complete, accurate, and on‑time estimating services… exemplary on each project.”